Fill out our Daily Orange reader survey to make our paper better


On Campus

Power restored to several SU campus buildings Thursday

Molly Gibbs | Photo Editor

Power was restored after more than 30 minutes shortly after 8 p.m.

UPDATED: Thursday, Feb. 21, 2019 at 8:40 p.m.

A power outage swept through much of Syracuse University’s Main Campus on Thursday at about 7:15 p.m. Power was restored by about 8 p.m.

Several buildings including Hinds Hall, Hendricks Chapel, the Hall of Languages, Booth Hall, Bowne Hall, Lawrison, Watson Theater, Slocum Hall, Crouse College, Life Sciences Complex and Haven Hall lost power.

Elevators were stuck in Haven Hall and the Brewster, Boland, Brockway complex when power was out.

Sarah Scalese, SU’s senior associate vice president for university communications, confirmed to The Daily Orange that power had been restored.

— News Editor Kennedy Rose contributed reporting to this story.

This is a developing story and will be updated with additional reporting.

ch





Top Stories